Sök:

Sökresultat:

256 Uppsatser om Breech delivery - Sida 1 av 18

Sätesförlossningar : Handläggning och utfall hos mödrar och barn vid vaginal förlossning och kejsarsnitt

Background: The incidence of caesarean section for breech presentation has reached approximately 90 % in Sweden. In many of these cases, by means of specific selection criteria, it would be as safe to plan for vaginal Breech delivery. Aim: The objective of this study was to investigate differences in management and to compare maternal and fetal outcomes according to delivery mode of breech presentation; vaginal vs. caesarian section. The study included breech presentation in full term singleton pregnancies at the UppsalaUniversityHospital, Uppsala, Sweden (UAS). Method: The study was based on medical record data with a retrospective, descriptive, comparative design with quantitative approach. The method for data collection was a manual review of patient records using a structured questionnaire. Results: Of the women with children in breech presentation during the period studied, 11 % gave birth vaginally.

Vaginal sätesförlossning. Barnmorskors synpunkter

Bakgrund: Cirka tre till fyra procent av alla barn ligger i sätesbjudning vid fullgången graviditet. Med alltmer antal lyckade vändningsförsök och ökat antal kejsarsnitt minskar antalet barn som förlöses vaginalt vid sätesbjudning. Det påverkar barnmorskors och obstetrikers möjlighet att upprätthålla kompetensen vid sätesbjudning. Syfte: Syftet med studien var att beskriva barnmorskors synpunkter om vaginal sätesförlossning. Metod: Öppna frågor vid intervjuer med fem förlossningsbarnmorskor i Göteborg.

Utvärdering av Auroraverksamheten - vid en Kvinnoklinik i södra Sverige

The main purpose of this stydy was to evaluate the Aurora clinic (for women afraid of birth/delivery) in the south of Sweden. Questionnaires were sent to 197 women who had contact with the Aurora clinic during 2007 and 2008. The group of participants contained both pregnant women and women who have given birth. A total of 136 women replied. The results showed that both the average age and the level of education of the women were high.

Leveransservicens betydelse som konkurrensmedel i apoteksbranschen : En fallstudie om hur Apoteket AB arbetar med leveransservice

During the last years, the pharmacy market undergone major changes. Re-regulation that has been done in 2009 meant that monopoly was unlocked for competition. In a market where firms offer equivalent products, increases the importance of delivery service as competitive tool to differentiate themselves among the crowd. This also applies to pharmacy market where the supplies of goods in large way consist of equivalent products regardless of the company.This case study observes the importance of delivery service in terms of competitive tool on pharmacy market by focusing on a company?s improvement in delivery service.

Mannens och kvinnans copingstrategier vid infertilitet : En systematisk litteraturstudie

The main purpose of this stydy was to evaluate the Aurora clinic (for women afraid of birth/delivery) in the south of Sweden. Questionnaires were sent to 197 women who had contact with the Aurora clinic during 2007 and 2008. The group of participants contained both pregnant women and women who have given birth. A total of 136 women replied. The results showed that both the average age and the level of education of the women were high.

Ledtidsanalys på Peltor AB med logisk gruppindelning på elektronikprodukter

This report is the result of a case study at Peltor AB during the spring semester of 2007. The task Peltor gave us was to improve the delivery accuracy and to lower the high finical value of delayed orders (backorder), and to divide the products into logical groups. The logical group will be a useful tool to remain a high level of service. If the level of service increases the company will be more competitive.The electronic department at Peltor has problems with delayed orders. According to Peltor, the problem is based on delivery lead time which is presumed.To increase the delivery accuracy, a lead time analysis is made to find the accumulated delivery lead times for each product.

Analys av faktorer som påverkar interna leveransledtider : Dimensionering av lager

It is becoming increasingly important for companies to meet customer demands due to intense competition in today's global market, that forcing companies to improve their offerings and become better at managing their supply chain (Shen et al., 2006).  Long lead times can be reduced by using different methods and strategies shows various researches. Lead times occur in the planning, production, inventories and handling of products (Treville et al., 2003).The aim of the study is to develop a method to analyze the factors that affect the length of internal delivery lead time in manufacturing companies. The method also included suggestions for reducing delivery lead-time to internal customers.The main factors that influenced the length of the on delivery lead times has summarized to make a selection among the factors that can have the most significant impact. The selected elements will be used as a method to analyze how these areas affect a company?s length on internal delivery lead times.The study shows that the causes of the long delivery lead times was the location of the customer order point, uncertain forecasts, long material and production planning time, and long waits in the production and storage.The delivery lead time, according to this report?s suggested improvements reduced by centralizing CODP and makes more reliable forecasts.

Tillverkning av mikronålar för medicinsk tillämpning

Transdermal drug delivery, besides painfulinjections with syringes, has long been associatedwith small size particle pharmaceuticals, which candiffuse through the skin. This method of drugadministration has only been applicable on a smallnumber of drugs, where active molecules are smalland delivery time should or can be long.Other drug delivery options are oral administrationand injection with hypodermic needles (ordinaryhospital syringes). In oral administration thestomach and liver tend to dissolve the drug and theeffect becomes more difficult to anticipate, anddrug delivery rates difficult to control. Hypodermicneedles are used as a mean of drug injectiondirectly into the bloodstream. This method ispainful and risks infection due to tissue damageand skin penetration.One way to get a painless non-damaging techniquewith high delivery rate that still can delivery largemolecules is to manufacture an array of microscopichollow needles and equip them with a pumping unitthat delivers the correct amount of drugs.This thesis shows the technique and possibility ofmanufacture micromachined needles using low costtechniques of Ion Track Technology (radiation ofheavy ions creates porous materials), electrolessdeposition (non-current activated wet chemistrymethod of depositing metal) and electroplating.

Women?s thoughts, expectations and desires in the presence of their next delivery after a caesarean section

Introduction: The caesarean section rate has increased significantly in the last twenty years. The fact that a woman has delivered by caesarean section once does not automatically mean that she will again. Some women want a repeat caesarean section while others want a vaginal birth. Objective: The aim of this study was to describe women?s thoughts, expectations and desires in the presence of their delivery after a previous caesarean section.

Processkartläggning samt förbättringsförslag vid Götene Stål & Verktygs AB

The purpose of this report is to come up with possible improvement suggestions to the distribution central at Götene Stål & Verktygs AB (GSV). GSV is a wholesale dealer located in Götene. The company doesn?t produce anything it self, it buys in products and sells them to customers.The distribution central at GSV is the place where the products comes in and gets ready to deliver.To come up with possible improvement suggestions we started with process mapping over the main process and the distribution centre process. The main process here is from the point where the customer gives GSV an order to the point where GSV deliver the order.Our result shows that the major problem in the distribution central at GSV is the big volume differences in the incoming goods.

Kvinnors erfarenheter av framfödandet vid planerad hemförlossning

Background: The prevalence of sphincter rupture during childbirth has increased in Sweden from half percent to three percent from 1973 to 1993. Women who undergo planned home birth have sphincter injuries to a smaller extent than women who undergo planned hospital births. Objective: The purpose of this study was to describe women?s experience of the last stages of delivery during planned home birth. Design: Inductive content analysis of 150 randomly selected delivery reports.

Mulesingens historia och framtid, samt desskonsekvenser för djurvälfärden.

Mulesing is a surgical husbandry procedure performed on lambs in Australia. The reason is toprevent severe fly-strike to the breech area, which otherwise risks to be soiled with faeces.This problem is mainly occurring in sheep of the Merino breed. Their fine wool is in demandworldwide due to high quality. Mulesing has been performed since the 1930?s, and eventhough alternative methods have been discussed nothing is yet generally accepted.

VillaService : En studie om hur planeringsarbete av en tjänstelansering lämpligen kan bedrivas

Service delivery acts like a process. This can enable the possibility of attracting attention towards the company who?s making use of this, furthermore generate several opportunities. However, it?s far from easy to deliver new services.

Leveransproblem : Ett problem vid strukturerad produktion

When building large buildings, such as compartment buildings, there is a number of deliveries arriving on the construction site daily. In order to receive these deliveries without disturbing the rest of the work going on JM often books a fixed unloading time. When doing that they can be prepared when the delivery arrives. Making sure there is a suitable unloading area, someone to meet the delivery and when needed proper machines, such as a tractor or a crane, to help unload bigger deliveries. The person receiving the delivery is supposed to make an acceptance control where they check the delivered goods making sure nothing has been damaged in transport and that they have received what they were supposed to receive.

Betydelsen av tidig hantering av nyanlända försökshundar till en försöksdjursavdelning :

AstraZeneca in Mölndal (AZRDM) uses beagles bred at Rååhöjdens kennel in Örkelljunga for their research purposes. The staff wishes to have mentally stable dogs to work with, sine stress can effect the research results. The purpose of this study was to put together the testresults from dogs delivered 2003 and 2004, to see if there is a connection between delivery age and testresult. We have also worked out a method to test if early planned handling of the dogs makes a difference on how the dogs later respond in a testsituation, and tried this method in a pilotstudy. The data that we have based our calculations on is 172 dogs, divided into 108 males and 64 females. We found a significant connection between the age at delivery and the testresult in contactability for female dogs delivered in 2003, where increasing age led to decreasing grades in the test at AZRDM. When looking at the difference in testresults between test number two at the kennel and the test at AZRDM we found a significant connection for female dogs delivered during 2003, ie the difference takes on a more negative value with increasing age at delivery. We found a difference between the two sexes in our calculations.

1 Nästa sida ->